Mineral water factory feasibility study. Over time, people's awareness of the importance of their health has increased. Therefore, many individuals have turned to purchasing mineral water regularly to maintain their health, as it is safer than home water.
A large number of people buy it while walking in the streets or order it from restaurants and cafes, due to the increasing demand for mineral water.
The idea of establishing a mineral water factory has become a successful and highly profitable idea, but a feasibility study for a mineral water factory must be conducted to ensure the project's success.
Mineral water factory feasibility study
We must pay attention to the feasibility study of a mineral water factory, and study the requirements, supplies, and tools without which we cannot implement the project. A feasibility study must be conducted for the project to prevent errors and to ensure the project's continuity:
Choosing a suitable location and space for the project: A mineral water factory project requires a large area to implement, as it includes a set of tanks, machinery, and large equipment. It is preferable to choose a project site close to water wells.
If the factory relies on Nile water, it can be built in industrial zones. Obtaining licenses for these zones is easy, and taxes and electricity costs are relatively low.
Project supplies and tools
This project requires the following basic supplies and tools:
- Water: The project is entirely dependent on water, which is why it is considered the most important factor in project implementation.
- Preform: The tool used to blow bottles.
- Bottle capping machine.
- The unit specializes in shortening or lengthening the neck of the bottle.
- Final packaging and wrapping unit.
Mineral water production line related supplies
A precise and accurate plan must be prepared, as some requirements must be present, such as:
- Mineral water bottling equipment and machinery.
- There are a number of tanks used to store water, which is treated to remove any impurities.
- Water treatment machine, filters, and conveyors.
Special section for filling bottles
This department receives empty bottles, washes them thoroughly, fills them with water, and places caps on each bottle. This process requires the presence of certain machines and equipment, including:
- A device for washing and filling.
- A motor with multiple, variable speeds.
- Special raw materials about 8 meters long, for transporting empty bottles, then filling them.
- Movable steel, stainless steel.
Equipping equipment with special specifications
- A water filter is required, and it is recommended that it be of a type with a flow rate of approximately 2,000 liters per hour.
- The presence of a pressurized sand filter, preferably one with a flow rate of up to 2,000 liters per hour.
- Premium filter mesh up to 5 microns in size and fineness and 304 single-layer polypropylene.
- Pump and HP
- 4 gallon membrane.
- Tank with a capacity of 1000 liters.
- Ozone generator, for mineral water production.
- UV water purifier with a flow rate of 1000 liters per hour.
- Water pressure vessels rated at 3016 SS up to 4 gallons.
- Strong power line, so you can easily operate equipment and machinery.
- A set of tubes.
Labor required for the project
A mineral water factory requires a certain number of workers to operate each of the following operations separately:
- The filling process requires only one worker.
- The canning process requires two workers.
- The process of making bottles requires two workers.
- Printing process, only one operator is needed.
- The packaging process requires two workers to complete.
- Miscellaneous, needs two people.
- The workforce must be trained and skilled in this field, and familiar with how to use the various machines and equipment used for bottling water.
- There must be an accounting department, electricians, and security personnel.
- Specialized cleaning staff must be available.
Project marketing
Marketing has a clear and effective impact on any project, as it helps achieve the highest possible sales and, consequently, increased profits. There are many ways to market a project, including:
- E-marketing: The mineral water factory project can be marketed on all social media platforms such as Facebook, Instagram, and others.
- We make agreements with retailers, where we supply the factory's products to them and benefit from their marketing.
- Conduct advertising campaigns on all media outlets to allow the largest possible number of people to learn about the factory's products.
- Pay attention to the quality and cleanliness of the packaging, as this helps attract customers.
Special licenses for establishing the project
One of the important steps in preparing a feasibility study for a mineral water factory project is obtaining the required licenses, in order to implement the project legally, which are:
- Issuing a commercial register through the Ministry of Commerce and Investment.
- Issuing a membership certificate for the Chamber of Commerce.
- Register with the Ministry of Labor and Social Development.
- Issuing a file from the Zakat and Revenue Authority.
- Register with the General Organization for Social Insurance.
Important tips for a successful factory project
There are some tips that you should know and follow to prevent errors, disruption, or damage to products or the machines and equipment used, including:
- Trucks should be provided to transport and distribute mineral water easily and quickly.
- Providing good and appropriate ventilation for the factory, whether natural or artificial ventilation.
- Connecting energy sources such as electricity and natural gas, and providing water and sanitation facilities.
- We'll prepare your warehouse in a way that protects it from moisture and direct sunlight, to preserve your water supply and ensure easy access and smooth roads.
Cost of establishing a mineral water factory
Many people are looking for the cost of establishing a mineral water factory. Below, we will explain the costs required for this project.
Costs of equipment and machinery used:
- The purification unit costs about $343,000.
- The price of a bottle manufacturing unit is $485,000.
- The packaging unit can be purchased for $333,000.
- Packaging and gluing unit at $45,000.
- The cost of 3 medium-sized trucks is $10,500.
- Water tanks cost $500.
Cost of some materials used
- 2 color stickers for $4.
- The cost of engraving and stamping the bottle is $1.15.
- The cost of the carton is $15.
Costs that change every month.
- Water costs $300.
- Worker salaries cost approximately $1,500.
- Electricity and maintenance costs of $200.
- The cost of distribution is $200.
Water factory profits
- Assume that a carton of mineral water will be sold to the retailer at the factory price of $2.60.
- The net profit will be 8 after deducting the cost of expenses which is 1.8.
- Assuming the factory produces about 300 cartons per day, the total daily profit will be $240.
Thus, we have explained how to conduct a feasibility study for a mineral water plant, the master plan for implementing the project and ensuring its continuity. Therefore, it must be conducted before starting the project.